Component:
Epoxy resin, antirust pigment, filler, loading material, curative agent and curing agent, two-component (A and B) package for paint
Application:
Anticorrosion primer for bridge, tower, port machine, structures on sea, chemical equipments, exterior on gas cabinet, and all metal structures corrupted by chemical medium.
Properties:
Hard film, good adhesion, excellent resistance to water and rust, salt fog, humid-dry cycling, cathodic protection and property of Zeta-potential, wearability.
Physical Parameter:
Color: Iron red
Density: 1.27 kg/L
Film Thickness: WFT: 95μm DFT: 50μm
Theoretic Dosage: 0.12 kg/m2
Flash Point: 27 ℃
Drying Time: 23℃, Dust-Free: ≤4 h, Hard Drying: ≤48 h, Fully Curing: 7d
Storage: 1 year
Application Parameter:
Formula Ratio: Component A : Component B = 10 : 1(Weight Ratio)
Curing Time: 23℃, 30 Min
Pot Life: 23℃, 8 h, unsuitable for application Below 5 ℃
Coating Method: Spray, hand brushing, roll coating
Diluent/ Dilution Ratio: Diluent for 102 epoxy resin coatings, <5%
Surface Treatment: Sand blasting must be made on surface of steel till qualified to Sa 2.5 or hand rust removing till qualified to St3. Secondary rust removing must be made on surface of shop primer till qualified to St3.
Pre-Coat Accessory Coatings: Directly used on surface of steel rust removing qualified to Sa 2.5, used with inorganic zinc and epoxy zinc rich primer.
Post-Coat Accessory Coatings: Top coats such as epoxy top coat, chlorinated rubber top coat, polyurethane top coat and acrylic acid top coat, etc.
Coating Interval: 23℃: Min.24 h; Max. 7 d
Claim:
The data in this Specification is derived from experiments and practical applications, and can be regarded as a guide for application. The title product is only for specialty application. Otherwise we only guarantee the quality of the said coating itself if it is used in other sectors undescribed herein or fresh sectors.