J55-4 Chlorosulphonated Polythylene Moisture-Proof Coatings for Cooling Tower(Primer/Topcoat)

Component:

Chlorosulphonated polythylene rubber as binder, modified resin, pigment filler, anti-blooming agent, cure accelerator and organic solvent, etc Three-component (A, B and C) for Primer, Two-component (A and B) for topcoat, Component A: slurry for primer and topcoat, Component B: common sulfur agent for primer and topcoat and Component C: curing agent for primer.


Application:

Protection for cooling tower


Illumination:

Excellent resistance to ageing of weather and freeze-thaw, heat, heat and humidity and cold, good resistance to cracking, mildew and fungus, good adhesion, quick drying, suitable for construction in low temperature and with humid, satisfied with the demand of the process of turning-over board and brushing simultaneously.


Physical Parameter:

Color: Primer, Brown Red; Topcoat, of All Kinds

Specific Gravity: Primer, Approx. 1.05 kg/L; Topcoat: Approx. 0.95 kg/L

Theoretic Dosage: Primer, 0.25 kg/m2; Topcoat: 0.2 kg/m2

Film Thickness: WFD: Primer: 160μm; Topcoat: 130μm;   DFT: Primer: 30μm; Topcoat: 25μm

Flash Point: Component A, 20℃; Component B, 10℃

Storage: Component A, 8 Months; Component B, 6 Months

Drying Time: 25℃, Dust-Free: ≤0.5 h, Hard Drying: ≤24 h, Fully Curing: 7 d


Application Parameter:

Formula Ratio: Primer: Component A : Component B : Component C = 10 : 1 : 0.25

            Topcoat: Component A : Component B = 10 : 1

Curing Time: Use directly after mixing

Pot Life: 25℃, 12 h

Coating Method: High-pressure airless spray, hand brushing, roll coating

Diluent/ Dilution Ratio: Diluent only for chlorosulphonated polythylene coatings ,     <5%

Coating Interval: 25℃, Min. 0.5 h,  Max. 1 month

Surface Treatment:  (1) concrete surface must be hard and close-grained, the phenomena of baring reinforcing steel bar, sand, shell and gap and rough surface must be avoid;

                 (2) the gap and hole on concrete surface must be filled and leveled up by slurry and sealer or scraped;

                 (3) when temperature is 25℃ and humidity is about 70%, the cast building by concrete can be coated no less than 4d, and the surface must be clean and no dust and slurry;

                (4) using the process of turning-over board and brushing simultaneously, the flexible part on the surface and knaggy part between the linking mould must be removed, and hole on screw board must be filled and leveled up;

                (5) mould lubricant of chemicals and emulsified oil must be used for steel mould for preventing affecting adhesion by the pollution on concrete surface;

                (6) when old tower being maintained, the surface must be no dust, lichen and unflat coating, when gunite covering and repairing, the surface must be coated after gunite covering no less than 4d.

Recommended Layers: 2 layers for primer and 2 layers for topcoat, 100μm DFT (total)


Claim:

The data in this Specification is derived from experiments and practical applications, and can be regarded as a guide for application. The title product is only for specialty application. Otherwise we only guarantee the quality of the said coating itself if it is used in other sectors undescribed herein or fresh sectors.

Immediately Consult
Message *
Name *
Phone
Email*
Verification code *
Other Products
New Products
No content